Working in the Watchtower’s Engineering Department

Before my transfer from the Engineering Department to the Writing Department in 1989, the architect designing a 30-story staff residence building (that was about to be built near the four Watchtower printery buildings) mentioned to me his need for a professional cost analysis system to be put into place for future building projects. He designed the buildings but the Accounting Department paid the bills.

Read the rest of this article…